{"id":8821,"date":"2026-10-05T01:22:19","date_gmt":"2026-10-05T01:22:19","guid":{"rendered":"https:\/\/ornoir.africa\/egypte-sactec-parc-eolien-shadwan-900-mw\/"},"modified":"2026-10-05T22:52:24","modified_gmt":"2026-10-05T22:52:24","slug":"egypte-sactec-parc-eolien-shadwan-900-mw","status":"publish","type":"post","link":"https:\/\/ornoir.africa\/en\/egypte-sactec-parc-eolien-shadwan-900-mw\/","title":{"rendered":"Egypt: Scatec starts construction of the 900 MW Shadwan wind farm"},"content":{"rendered":"<p>Scatec and EDF power solutions have started construction of the 900 MW Shadwan onshore wind farm in Egypt\u2019s Red Sea governorate. The project, with estimated total costs of $716 million, could produce around 4 terawatt-hours of electricity annually. According to the developer\u2019s estimates, this output would avoid approximately 1.6 million tonnes of CO\u2082 emissions each year compared with equivalent fossil generation.<\/p>\n<p>The start of work marks the move from development to construction. This matters in a sector where capacity announcements can precede financing, sales contracts and works by several years. Success now depends on equipment delivery, grid connection, road availability and adherence to the construction schedule.<\/p>\n<p>Scatec signed $150 million in equity bridge financing with The Arab Energy Fund. The three-year facility allocates $50 million to Shadwan and $100 million to another Egyptian project, Energy Valley, combining 1,950 MW of solar with 3,935 MWh of storage. Bridge financing supports capital mobilisation while the long-term financial structure is finalised. It therefore does not alone represent all funding required for the wind project.<\/p>\n<h2>Financing and grid connection for the wind farm<\/h2>\n<p>The announced $716 million cost places Shadwan among the continent\u2019s major renewable energy projects. If built and operated as forecast, 900 MW will strengthen Egypt\u2019s electricity system and diversify generation sources. The country has committed to expanding renewables while meeting demand driven by population growth, industry and urbanisation.<\/p>\n<p>The location near Ras Shukeir on the Red Sea coast offers significant wind potential. Wind generation nevertheless varies with weather and requires a grid able to absorb fluctuations. Transmission and balancing investment will determine how much electricity can actually be injected. A farm without adequate connection risks curtailed generation, reducing revenues and expected climate benefits.<\/p>\n<p>The project provides for a 29% stake by EDF power solutions under a joint development agreement, while Scatec intends to invite additional equity partners. This structure shares investment and risk and involves actors with international renewable development and operating experience. Final ownership, financing conditions and operating contracts should be monitored as construction progresses.<\/p>\n<p>Bridge financing reveals an often less visible challenge: the gap between immediate construction spending and long-term financing. Lenders examine power purchase agreements, public guarantees, currency risks and the buyer\u2019s payment capacity. Interest rates and currency movements can alter total costs. Finalising a stable financial structure would reduce uncertainty for investors and suppliers.<\/p>\n<h2>Local benefits and performance to verify<\/h2>\n<p>Local benefits depend on construction employment, subcontracting, training and maintenance once operational. Wind projects require specialised turbine and grid maintenance technicians. Training programmes and local contracts can develop lasting skills. Impact studies must also address land use, migratory birds, habitats and relations with neighbouring communities.<\/p>\n<p>Announced annual figures are developer estimates requiring verification after commissioning. Actual output depends on capacity factor, turbine availability, wind conditions and grid limitations. Avoided emissions depend on the fossil generation displaced; they do not directly measure total project lifecycle emissions.<\/p>\n<p>Shadwan is an important addition to Egypt\u2019s renewable portfolio, but construction is only one stage. Connection, full financing, operation and system integration will determine its impact. Next milestones are construction progress, financing agreement closure and commissioning date. If schedules are met, the project will expand low-carbon supply and strengthen Egyptian participants\u2019 experience in large wind farms.<\/p>\n<p>Diversified financing can facilitate additional partners and ease a single developer\u2019s equity constraints. Equipment costs, turbine delivery times and installation team availability must nevertheless be monitored, as they affect many projects worldwide. A credible construction schedule requires alignment between suppliers, the grid and the electricity buyer. Regular publication of verifiable milestones will distinguish physical progress from financial announcements.<\/p>","protected":false},"excerpt":{"rendered":"<p>Scatec and EDF power solutions begin construction of Egypt\u2019s 900 MW Shadwan wind farm, with an estimated cost of $716 million.<\/p>","protected":false},"author":1,"featured_media":8820,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"content-type":"","_lmt_disableupdate":"1","_lmt_disable":"","page_builder":"","footnotes":""},"categories":[5,25],"tags":[283,3476,3475],"class_list":["post-8821","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-actualite","category-energie","tag-egypte","tag-energie-eolienne","tag-energies-renouvelables"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>\u00c9gypte : Scatec lance le parc \u00e9olien Shadwan de 900 MW<\/title>\n<meta name=\"description\" content=\"Scatec et EDF lancent un parc \u00e9olien de 900 MW \u00e0 Shadwan. Le projet de 716 millions de dollars vise 4 TWh de production annuelle.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/ornoir.africa\/en\/egypte-sactec-parc-eolien-shadwan-900-mw\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\u00c9gypte : Scatec lance le parc \u00e9olien Shadwan de 900 MW\" \/>\n<meta property=\"og:description\" content=\"Scatec et EDF lancent un parc \u00e9olien de 900 MW \u00e0 Shadwan. Le projet de 716 millions de dollars vise 4 TWh de production annuelle.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/ornoir.africa\/en\/egypte-sactec-parc-eolien-shadwan-900-mw\/\" \/>\n<meta property=\"og:site_name\" content=\"Or Noir Africa\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/OrNoirAfrica\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-05T01:22:19+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-05T22:52:24+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/ornoir.africa\/wp-content\/uploads\/2026\/10\/shadwan-wind-egypt.webp\" \/>\n\t<meta property=\"og:image:width\" content=\"1599\" \/>\n\t<meta property=\"og:image:height\" content=\"900\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/webp\" \/>\n<meta name=\"author\" content=\"Mapath\u00e9 SOW\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@OrNoirAfrica\" \/>\n<meta name=\"twitter:site\" content=\"@OrNoirAfrica\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Mapath\u00e9 SOW\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/ornoir.africa\\\/egypte-sactec-parc-eolien-shadwan-900-mw\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/ornoir.africa\\\/egypte-sactec-parc-eolien-shadwan-900-mw\\\/\"},\"author\":{\"name\":\"Mapath\u00e9 SOW\",\"@id\":\"https:\\\/\\\/ornoir.africa\\\/#\\\/schema\\\/person\\\/c8f0dccd7692ef1c102cc8d1c2c5b5ea\"},\"headline\":\"\u00c9gypte : Scatec lance la construction du parc \u00e9olien de 900 MW \u00e0 Shadwan\",\"datePublished\":\"2026-10-05T01:22:19+00:00\",\"dateModified\":\"2026-10-05T22:52:24+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/ornoir.africa\\\/egypte-sactec-parc-eolien-shadwan-900-mw\\\/\"},\"wordCount\":983,\"image\":{\"@id\":\"https:\\\/\\\/ornoir.africa\\\/egypte-sactec-parc-eolien-shadwan-900-mw\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/ornoir.africa\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/shadwan-wind-egypt.webp\",\"keywords\":[\"\u00c9gypte\",\"\u00c9nergie \u00e9olienne\",\"\u00c9nergies renouvelables\"],\"articleSection\":[\"ACTUALIT\u00c9\",\"\u00c9NERGIE\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/ornoir.africa\\\/egypte-sactec-parc-eolien-shadwan-900-mw\\\/\",\"url\":\"https:\\\/\\\/ornoir.africa\\\/egypte-sactec-parc-eolien-shadwan-900-mw\\\/\",\"name\":\"\u00c9gypte : Scatec lance le parc \u00e9olien Shadwan de 900 MW\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/ornoir.africa\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/ornoir.africa\\\/egypte-sactec-parc-eolien-shadwan-900-mw\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/ornoir.africa\\\/egypte-sactec-parc-eolien-shadwan-900-mw\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/ornoir.africa\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/shadwan-wind-egypt.webp\",\"datePublished\":\"2026-10-05T01:22:19+00:00\",\"dateModified\":\"2026-10-05T22:52:24+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/ornoir.africa\\\/#\\\/schema\\\/person\\\/c8f0dccd7692ef1c102cc8d1c2c5b5ea\"},\"description\":\"Scatec et EDF lancent un parc \u00e9olien de 900 MW \u00e0 Shadwan. Le projet de 716 millions de dollars vise 4 TWh de production annuelle.\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/ornoir.africa\\\/egypte-sactec-parc-eolien-shadwan-900-mw\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/ornoir.africa\\\/egypte-sactec-parc-eolien-shadwan-900-mw\\\/#primaryimage\",\"url\":\"https:\\\/\\\/ornoir.africa\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/shadwan-wind-egypt.webp\",\"contentUrl\":\"https:\\\/\\\/ornoir.africa\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/shadwan-wind-egypt.webp\",\"width\":1599,\"height\":900,\"caption\":\"Illustration g\u00e9n\u00e9r\u00e9e par IA, \u00e0 titre illustratif.\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/ornoir.africa\\\/#website\",\"url\":\"https:\\\/\\\/ornoir.africa\\\/\",\"name\":\"Or Noir Africa\",\"description\":\"Tous sur le P\u00e9trole, Gaz, \u00c9nergie &amp; Mines en Afrique\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/ornoir.africa\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/ornoir.africa\\\/#\\\/schema\\\/person\\\/c8f0dccd7692ef1c102cc8d1c2c5b5ea\",\"name\":\"Mapath\u00e9 SOW\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/ornoir.africa\\\/wp-content\\\/litespeed\\\/avatar\\\/fc4f53fd7869a90ae23c8c991c62cc6f.jpg?ver=1793823453\",\"url\":\"https:\\\/\\\/ornoir.africa\\\/wp-content\\\/litespeed\\\/avatar\\\/fc4f53fd7869a90ae23c8c991c62cc6f.jpg?ver=1793823453\",\"contentUrl\":\"https:\\\/\\\/ornoir.africa\\\/wp-content\\\/litespeed\\\/avatar\\\/fc4f53fd7869a90ae23c8c991c62cc6f.jpg?ver=1793823453\",\"caption\":\"Mapath\u00e9 SOW\"},\"url\":\"https:\\\/\\\/ornoir.africa\\\/en\\\/author\\\/admin\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Egypt: Scatec starts the 900 MW Shadwan wind farm","description":"Scatec and EDF power solutions begin construction of Egypt\u2019s 900 MW Shadwan wind farm, with an estimated cost of $716 million.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/ornoir.africa\/en\/egypte-sactec-parc-eolien-shadwan-900-mw\/","og_locale":"en_US","og_type":"article","og_title":"\u00c9gypte : Scatec lance le parc \u00e9olien Shadwan de 900 MW","og_description":"Scatec et EDF lancent un parc \u00e9olien de 900 MW \u00e0 Shadwan. Le projet de 716 millions de dollars vise 4 TWh de production annuelle.","og_url":"https:\/\/ornoir.africa\/en\/egypte-sactec-parc-eolien-shadwan-900-mw\/","og_site_name":"Or Noir Africa","article_publisher":"https:\/\/www.facebook.com\/OrNoirAfrica","article_published_time":"2026-10-05T01:22:19+00:00","article_modified_time":"2026-10-05T22:52:24+00:00","og_image":[{"width":1599,"height":900,"url":"https:\/\/ornoir.africa\/wp-content\/uploads\/2026\/10\/shadwan-wind-egypt.webp","type":"image\/webp"}],"author":"Mapath\u00e9 SOW","twitter_card":"summary_large_image","twitter_creator":"@OrNoirAfrica","twitter_site":"@OrNoirAfrica","twitter_misc":{"Written by":"Mapath\u00e9 SOW","Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/ornoir.africa\/egypte-sactec-parc-eolien-shadwan-900-mw\/#article","isPartOf":{"@id":"https:\/\/ornoir.africa\/egypte-sactec-parc-eolien-shadwan-900-mw\/"},"author":{"name":"Mapath\u00e9 SOW","@id":"https:\/\/ornoir.africa\/#\/schema\/person\/c8f0dccd7692ef1c102cc8d1c2c5b5ea"},"headline":"\u00c9gypte : Scatec lance la construction du parc \u00e9olien de 900 MW \u00e0 Shadwan","datePublished":"2026-10-05T01:22:19+00:00","dateModified":"2026-10-05T22:52:24+00:00","mainEntityOfPage":{"@id":"https:\/\/ornoir.africa\/egypte-sactec-parc-eolien-shadwan-900-mw\/"},"wordCount":983,"image":{"@id":"https:\/\/ornoir.africa\/egypte-sactec-parc-eolien-shadwan-900-mw\/#primaryimage"},"thumbnailUrl":"https:\/\/ornoir.africa\/wp-content\/uploads\/2026\/10\/shadwan-wind-egypt.webp","keywords":["\u00c9gypte","\u00c9nergie \u00e9olienne","\u00c9nergies renouvelables"],"articleSection":["ACTUALIT\u00c9","\u00c9NERGIE"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/ornoir.africa\/egypte-sactec-parc-eolien-shadwan-900-mw\/","url":"https:\/\/ornoir.africa\/egypte-sactec-parc-eolien-shadwan-900-mw\/","name":"Egypt: Scatec starts the 900 MW Shadwan wind farm","isPartOf":{"@id":"https:\/\/ornoir.africa\/#website"},"primaryImageOfPage":{"@id":"https:\/\/ornoir.africa\/egypte-sactec-parc-eolien-shadwan-900-mw\/#primaryimage"},"image":{"@id":"https:\/\/ornoir.africa\/egypte-sactec-parc-eolien-shadwan-900-mw\/#primaryimage"},"thumbnailUrl":"https:\/\/ornoir.africa\/wp-content\/uploads\/2026\/10\/shadwan-wind-egypt.webp","datePublished":"2026-10-05T01:22:19+00:00","dateModified":"2026-10-05T22:52:24+00:00","author":{"@id":"https:\/\/ornoir.africa\/#\/schema\/person\/c8f0dccd7692ef1c102cc8d1c2c5b5ea"},"description":"Scatec and EDF power solutions begin construction of Egypt\u2019s 900 MW Shadwan wind farm, with an estimated cost of $716 million.","inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/ornoir.africa\/egypte-sactec-parc-eolien-shadwan-900-mw\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/ornoir.africa\/egypte-sactec-parc-eolien-shadwan-900-mw\/#primaryimage","url":"https:\/\/ornoir.africa\/wp-content\/uploads\/2026\/10\/shadwan-wind-egypt.webp","contentUrl":"https:\/\/ornoir.africa\/wp-content\/uploads\/2026\/10\/shadwan-wind-egypt.webp","width":1599,"height":900,"caption":"Illustration g\u00e9n\u00e9r\u00e9e par IA, \u00e0 titre illustratif."},{"@type":"WebSite","@id":"https:\/\/ornoir.africa\/#website","url":"https:\/\/ornoir.africa\/","name":"Or Noir Africa","description":"All about oil, gas, energy and mining in Africa","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/ornoir.africa\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/ornoir.africa\/#\/schema\/person\/c8f0dccd7692ef1c102cc8d1c2c5b5ea","name":"Mapath\u00e9 SOW","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/ornoir.africa\/wp-content\/litespeed\/avatar\/fc4f53fd7869a90ae23c8c991c62cc6f.jpg?ver=1793823453","url":"https:\/\/ornoir.africa\/wp-content\/litespeed\/avatar\/fc4f53fd7869a90ae23c8c991c62cc6f.jpg?ver=1793823453","contentUrl":"https:\/\/ornoir.africa\/wp-content\/litespeed\/avatar\/fc4f53fd7869a90ae23c8c991c62cc6f.jpg?ver=1793823453","caption":"Mapath\u00e9 SOW"},"url":"https:\/\/ornoir.africa\/en\/author\/admin\/"}]}},"_links":{"self":[{"href":"https:\/\/ornoir.africa\/en\/wp-json\/wp\/v2\/posts\/8821","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ornoir.africa\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ornoir.africa\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ornoir.africa\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ornoir.africa\/en\/wp-json\/wp\/v2\/comments?post=8821"}],"version-history":[{"count":2,"href":"https:\/\/ornoir.africa\/en\/wp-json\/wp\/v2\/posts\/8821\/revisions"}],"predecessor-version":[{"id":8879,"href":"https:\/\/ornoir.africa\/en\/wp-json\/wp\/v2\/posts\/8821\/revisions\/8879"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ornoir.africa\/en\/wp-json\/wp\/v2\/media\/8820"}],"wp:attachment":[{"href":"https:\/\/ornoir.africa\/en\/wp-json\/wp\/v2\/media?parent=8821"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ornoir.africa\/en\/wp-json\/wp\/v2\/categories?post=8821"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ornoir.africa\/en\/wp-json\/wp\/v2\/tags?post=8821"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}