{"id":7288,"date":"2025-03-21T02:49:04","date_gmt":"2025-03-21T02:49:04","guid":{"rendered":"https:\/\/ornoirafrica.com\/?p=7288"},"modified":"2026-10-09T03:20:17","modified_gmt":"2026-10-09T03:20:17","slug":"senegal-sicilasaldo-enerco-and-micoperi-group-win-key-contract-for-the-gta-gandon-gas-pipeline","status":"publish","type":"post","link":"https:\/\/ornoir.africa\/en\/senegal-sicilasaldo-enerco-and-micoperi-group-win-key-contract-for-the-gta-gandon-gas-pipeline\/","title":{"rendered":"Senegal: the Sicilsaldo, Enerco and Micoperi consortium wins a key contract for the GTA-Gandon gas pipeline"},"content":{"rendered":"<p>R\u00e9seau Gazier du S\u00e9n\u00e9gal (RGS) has awarded a strategic contract to the Sicilsaldo SPA, Enerco SPA and Micoperi SPA consortium to build the gas pipeline linking the GTA hub\/terminal to the Gandon CCGT power plant. The project, worth FCFA 181,858,162,064 excluding VAT (around USD 287 million), marks a major step forward in Senegal's ambition to strengthen its energy sovereignty.<\/p>\n<p>The call for tenders, launched on 4 October 2024, covered the engineering, procurement, construction and financing (EPC-F) of the 85 km-long Northern Segment gas pipeline. This section, which connects the GTA hub to the Gandon power station, is a key component of the R\u00e9seau Gazier du S\u00e9n\u00e9gal, a 400 km project to transport natural gas from offshore fields to points of consumption.<\/p>\n<p>The consortium, made up of three specialist companies, Sicilsaldo, Enerco and Micoperi, was chosen over three other candidates, including China Petroleum Pipeline Engineering Co Ltd (CPP) and Groupement PowerChina International Group Limited-CNPC Offshore Engineering. The award, made official after a rigorous evaluation process, is based on the provisions of the R\u00e9seau Gazier du S\u00e9n\u00e9gal (RGS), in accordance with decree no. 005814 of 29 March 2024 and decree no. 2022-2295 of 28 December 2022.<\/p>\n<p>The contract, which runs for 14 months from notification of the start-up order, commits the consortium to delivering an operational gas pipeline by mid-2026. This tight schedule reflects the urgent need for Senegal to secure its gas supply, which is essential for powering its electricity plants and reducing its dependence on imported fuels such as fuel oil and coal.<\/p>\n<p>This project is part of a wider vision of economic transformation supported by the RGS, which aims to make gas a lever for industrial development and access to energy. By connecting the GTA hub to Gandon, the Northern Segment will contribute to the production of cleaner, more affordable electricity, while supporting the country's climate objectives, in particular an expected reduction of 30 million tonnes of CO2 by 2050.<\/p>\n<p>With this award, Senegal has entrusted an experienced consortium with an infrastructure that is crucial to its energy future, reinforcing its position as an emerging player in the exploitation of gas in West Africa.<\/p>","protected":false},"excerpt":{"rendered":"<p>R\u00e9seau Gazier du S\u00e9n\u00e9gal has awarded the Sicilsaldo, Enerco and Micoperi consortium a contract for the gas pipeline linking the GTA hub and terminal to Gandon\u2026<\/p>","protected":false},"author":1,"featured_media":7289,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"content-type":"","_lmt_disableupdate":"no","_lmt_disable":"","page_builder":"","footnotes":""},"categories":[5,677],"tags":[3231,3230,258,38,3232,3229,3213,36,3194],"class_list":["post-7288","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-actualite","category-gaz","tag-enerco","tag-gandon","tag-gazoduc","tag-gta","tag-micoperi","tag-reseau-gazier-du-senegal","tag-rgs","tag-petrole-et-gaz-au-senegal","tag-sicilsaldo"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>S\u00e9n\u00e9gal : le groupement Sicilsaldo, Enerco et Micoperi remporte un contrat cl\u00e9 pour le gazoduc GTA-Gandon - Or Noir Africa<\/title>\n<meta name=\"description\" content=\"Le R\u00e9seau Gazier du S\u00e9n\u00e9gal (RGS) a attribu\u00e9 un contrat strat\u00e9gique au groupement Sicilsaldo SPA, Enerco SPA et Micoperi SPA pour la r\u00e9alisation en deux \u00e9tapes du gazoduc reliant le hub\/terminal GTA \u00e0 la centrale \u00e9lectrique de Gandon CCGT.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/ornoir.africa\/en\/senegal-sicilasaldo-enerco-and-micoperi-group-win-key-contract-for-the-gta-gandon-gas-pipeline\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"S\u00e9n\u00e9gal : le groupement Sicilsaldo, Enerco et Micoperi remporte un contrat cl\u00e9 pour le gazoduc GTA-Gandon - Or Noir Africa\" \/>\n<meta property=\"og:description\" content=\"Le R\u00e9seau Gazier du S\u00e9n\u00e9gal (RGS) a attribu\u00e9 un contrat strat\u00e9gique au groupement Sicilsaldo SPA, Enerco SPA et Micoperi SPA pour la r\u00e9alisation en deux \u00e9tapes du gazoduc reliant le hub\/terminal GTA \u00e0 la centrale \u00e9lectrique de Gandon CCGT.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/ornoir.africa\/en\/senegal-sicilasaldo-enerco-and-micoperi-group-win-key-contract-for-the-gta-gandon-gas-pipeline\/\" \/>\n<meta property=\"og:site_name\" content=\"Or Noir Africa\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/OrNoirAfrica\" \/>\n<meta property=\"article:published_time\" content=\"2025-03-21T02:49:04+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-09T03:20:17+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/ornoir.africa\/wp-content\/uploads\/2025\/03\/Sicilsaldo.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"576\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Mapath\u00e9 SOW\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@OrNoirAfrica\" \/>\n<meta name=\"twitter:site\" content=\"@OrNoirAfrica\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Mapath\u00e9 SOW\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/ornoir.africa\\\/senegal-le-groupement-sicilsaldo-enerco-et-micoperi-remporte-un-contrat-cle-pour-le-gazoduc-gta-gandon\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/ornoir.africa\\\/senegal-le-groupement-sicilsaldo-enerco-et-micoperi-remporte-un-contrat-cle-pour-le-gazoduc-gta-gandon\\\/\"},\"author\":{\"name\":\"Mapath\u00e9 SOW\",\"@id\":\"https:\\\/\\\/ornoir.africa\\\/#\\\/schema\\\/person\\\/c8f0dccd7692ef1c102cc8d1c2c5b5ea\"},\"headline\":\"S\u00e9n\u00e9gal : le groupement Sicilsaldo, Enerco et Micoperi remporte un contrat cl\u00e9 pour le gazoduc GTA-Gandon\",\"datePublished\":\"2025-03-21T02:49:04+00:00\",\"dateModified\":\"2026-10-09T03:20:17+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/ornoir.africa\\\/senegal-le-groupement-sicilsaldo-enerco-et-micoperi-remporte-un-contrat-cle-pour-le-gazoduc-gta-gandon\\\/\"},\"wordCount\":417,\"image\":{\"@id\":\"https:\\\/\\\/ornoir.africa\\\/senegal-le-groupement-sicilsaldo-enerco-et-micoperi-remporte-un-contrat-cle-pour-le-gazoduc-gta-gandon\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/ornoir.africa\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/Sicilsaldo.jpg\",\"keywords\":[\"Enerco\",\"Gandon\",\"gazoduc\",\"GTA\",\"Micoperi\",\"R\u00e9seau Gazier du S\u00e9n\u00e9gal\",\"RGS\",\"S\u00e9n\u00e9gal\",\"Sicilsaldo\"],\"articleSection\":[\"ACTUALIT\u00c9\",\"GAZ\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/ornoir.africa\\\/senegal-le-groupement-sicilsaldo-enerco-et-micoperi-remporte-un-contrat-cle-pour-le-gazoduc-gta-gandon\\\/\",\"url\":\"https:\\\/\\\/ornoir.africa\\\/senegal-le-groupement-sicilsaldo-enerco-et-micoperi-remporte-un-contrat-cle-pour-le-gazoduc-gta-gandon\\\/\",\"name\":\"S\u00e9n\u00e9gal : le groupement Sicilsaldo, Enerco et Micoperi remporte un contrat cl\u00e9 pour le gazoduc GTA-Gandon - Or Noir Africa\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/ornoir.africa\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/ornoir.africa\\\/senegal-le-groupement-sicilsaldo-enerco-et-micoperi-remporte-un-contrat-cle-pour-le-gazoduc-gta-gandon\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/ornoir.africa\\\/senegal-le-groupement-sicilsaldo-enerco-et-micoperi-remporte-un-contrat-cle-pour-le-gazoduc-gta-gandon\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/ornoir.africa\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/Sicilsaldo.jpg\",\"datePublished\":\"2025-03-21T02:49:04+00:00\",\"dateModified\":\"2026-10-09T03:20:17+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/ornoir.africa\\\/#\\\/schema\\\/person\\\/c8f0dccd7692ef1c102cc8d1c2c5b5ea\"},\"description\":\"Le R\u00e9seau Gazier du S\u00e9n\u00e9gal (RGS) a attribu\u00e9 un contrat strat\u00e9gique au groupement Sicilsaldo SPA, Enerco SPA et Micoperi SPA pour la r\u00e9alisation en deux \u00e9tapes du gazoduc reliant le hub\\\/terminal GTA \u00e0 la centrale \u00e9lectrique de Gandon CCGT.\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/ornoir.africa\\\/senegal-le-groupement-sicilsaldo-enerco-et-micoperi-remporte-un-contrat-cle-pour-le-gazoduc-gta-gandon\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/ornoir.africa\\\/senegal-le-groupement-sicilsaldo-enerco-et-micoperi-remporte-un-contrat-cle-pour-le-gazoduc-gta-gandon\\\/#primaryimage\",\"url\":\"https:\\\/\\\/ornoir.africa\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/Sicilsaldo.jpg\",\"contentUrl\":\"https:\\\/\\\/ornoir.africa\\\/wp-content\\\/uploads\\\/2025\\\/03\\\/Sicilsaldo.jpg\",\"width\":1024,\"height\":576,\"caption\":\"S\u00e9n\u00e9gal : le groupement Sicilsaldo, Enerco et Micoperi remporte un contrat cl\u00e9 pour le gazoduc GTA-Gandon\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/ornoir.africa\\\/#website\",\"url\":\"https:\\\/\\\/ornoir.africa\\\/\",\"name\":\"Or Noir Africa\",\"description\":\"Tous sur le P\u00e9trole, Gaz, \u00c9nergie &amp; Mines en Afrique\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/ornoir.africa\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/ornoir.africa\\\/#\\\/schema\\\/person\\\/c8f0dccd7692ef1c102cc8d1c2c5b5ea\",\"name\":\"Mapath\u00e9 SOW\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/ornoir.africa\\\/wp-content\\\/litespeed\\\/avatar\\\/fc4f53fd7869a90ae23c8c991c62cc6f.jpg?ver=1794428260\",\"url\":\"https:\\\/\\\/ornoir.africa\\\/wp-content\\\/litespeed\\\/avatar\\\/fc4f53fd7869a90ae23c8c991c62cc6f.jpg?ver=1794428260\",\"contentUrl\":\"https:\\\/\\\/ornoir.africa\\\/wp-content\\\/litespeed\\\/avatar\\\/fc4f53fd7869a90ae23c8c991c62cc6f.jpg?ver=1794428260\",\"caption\":\"Mapath\u00e9 SOW\"},\"url\":\"https:\\\/\\\/ornoir.africa\\\/en\\\/author\\\/admin\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Senegal: the Sicilsaldo, Enerco and Micoperi consortium wins a key contract for the GTA-Gandon gas pipeline - Or Noir Africa","description":"R\u00e9seau Gazier du S\u00e9n\u00e9gal (RGS) has awarded a strategic contract to the Sicilsaldo SPA, Enerco SPA and Micoperi SPA consortium for the two-stage construction of the gas pipeline linking the GTA hub\/terminal to the Gandon CCGT power plant.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/ornoir.africa\/en\/senegal-sicilasaldo-enerco-and-micoperi-group-win-key-contract-for-the-gta-gandon-gas-pipeline\/","og_locale":"en_US","og_type":"article","og_title":"S\u00e9n\u00e9gal : le groupement Sicilsaldo, Enerco et Micoperi remporte un contrat cl\u00e9 pour le gazoduc GTA-Gandon - Or Noir Africa","og_description":"Le R\u00e9seau Gazier du S\u00e9n\u00e9gal (RGS) a attribu\u00e9 un contrat strat\u00e9gique au groupement Sicilsaldo SPA, Enerco SPA et Micoperi SPA pour la r\u00e9alisation en deux \u00e9tapes du gazoduc reliant le hub\/terminal GTA \u00e0 la centrale \u00e9lectrique de Gandon CCGT.","og_url":"https:\/\/ornoir.africa\/en\/senegal-sicilasaldo-enerco-and-micoperi-group-win-key-contract-for-the-gta-gandon-gas-pipeline\/","og_site_name":"Or Noir Africa","article_publisher":"https:\/\/www.facebook.com\/OrNoirAfrica","article_published_time":"2025-03-21T02:49:04+00:00","article_modified_time":"2026-10-09T03:20:17+00:00","og_image":[{"width":1024,"height":576,"url":"https:\/\/ornoir.africa\/wp-content\/uploads\/2025\/03\/Sicilsaldo.jpg","type":"image\/jpeg"}],"author":"Mapath\u00e9 SOW","twitter_card":"summary_large_image","twitter_creator":"@OrNoirAfrica","twitter_site":"@OrNoirAfrica","twitter_misc":{"Written by":"Mapath\u00e9 SOW","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/ornoir.africa\/senegal-le-groupement-sicilsaldo-enerco-et-micoperi-remporte-un-contrat-cle-pour-le-gazoduc-gta-gandon\/#article","isPartOf":{"@id":"https:\/\/ornoir.africa\/senegal-le-groupement-sicilsaldo-enerco-et-micoperi-remporte-un-contrat-cle-pour-le-gazoduc-gta-gandon\/"},"author":{"name":"Mapath\u00e9 SOW","@id":"https:\/\/ornoir.africa\/#\/schema\/person\/c8f0dccd7692ef1c102cc8d1c2c5b5ea"},"headline":"S\u00e9n\u00e9gal : le groupement Sicilsaldo, Enerco et Micoperi remporte un contrat cl\u00e9 pour le gazoduc GTA-Gandon","datePublished":"2025-03-21T02:49:04+00:00","dateModified":"2026-10-09T03:20:17+00:00","mainEntityOfPage":{"@id":"https:\/\/ornoir.africa\/senegal-le-groupement-sicilsaldo-enerco-et-micoperi-remporte-un-contrat-cle-pour-le-gazoduc-gta-gandon\/"},"wordCount":417,"image":{"@id":"https:\/\/ornoir.africa\/senegal-le-groupement-sicilsaldo-enerco-et-micoperi-remporte-un-contrat-cle-pour-le-gazoduc-gta-gandon\/#primaryimage"},"thumbnailUrl":"https:\/\/ornoir.africa\/wp-content\/uploads\/2025\/03\/Sicilsaldo.jpg","keywords":["Enerco","Gandon","gazoduc","GTA","Micoperi","R\u00e9seau Gazier du S\u00e9n\u00e9gal","RGS","S\u00e9n\u00e9gal","Sicilsaldo"],"articleSection":["ACTUALIT\u00c9","GAZ"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/ornoir.africa\/senegal-le-groupement-sicilsaldo-enerco-et-micoperi-remporte-un-contrat-cle-pour-le-gazoduc-gta-gandon\/","url":"https:\/\/ornoir.africa\/senegal-le-groupement-sicilsaldo-enerco-et-micoperi-remporte-un-contrat-cle-pour-le-gazoduc-gta-gandon\/","name":"Senegal: the Sicilsaldo, Enerco and Micoperi consortium wins a key contract for the GTA-Gandon gas pipeline - Or Noir Africa","isPartOf":{"@id":"https:\/\/ornoir.africa\/#website"},"primaryImageOfPage":{"@id":"https:\/\/ornoir.africa\/senegal-le-groupement-sicilsaldo-enerco-et-micoperi-remporte-un-contrat-cle-pour-le-gazoduc-gta-gandon\/#primaryimage"},"image":{"@id":"https:\/\/ornoir.africa\/senegal-le-groupement-sicilsaldo-enerco-et-micoperi-remporte-un-contrat-cle-pour-le-gazoduc-gta-gandon\/#primaryimage"},"thumbnailUrl":"https:\/\/ornoir.africa\/wp-content\/uploads\/2025\/03\/Sicilsaldo.jpg","datePublished":"2025-03-21T02:49:04+00:00","dateModified":"2026-10-09T03:20:17+00:00","author":{"@id":"https:\/\/ornoir.africa\/#\/schema\/person\/c8f0dccd7692ef1c102cc8d1c2c5b5ea"},"description":"R\u00e9seau Gazier du S\u00e9n\u00e9gal (RGS) has awarded a strategic contract to the Sicilsaldo SPA, Enerco SPA and Micoperi SPA consortium for the two-stage construction of the gas pipeline linking the GTA hub\/terminal to the Gandon CCGT power plant.","inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/ornoir.africa\/senegal-le-groupement-sicilsaldo-enerco-et-micoperi-remporte-un-contrat-cle-pour-le-gazoduc-gta-gandon\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/ornoir.africa\/senegal-le-groupement-sicilsaldo-enerco-et-micoperi-remporte-un-contrat-cle-pour-le-gazoduc-gta-gandon\/#primaryimage","url":"https:\/\/ornoir.africa\/wp-content\/uploads\/2025\/03\/Sicilsaldo.jpg","contentUrl":"https:\/\/ornoir.africa\/wp-content\/uploads\/2025\/03\/Sicilsaldo.jpg","width":1024,"height":576,"caption":"S\u00e9n\u00e9gal : le groupement Sicilsaldo, Enerco et Micoperi remporte un contrat cl\u00e9 pour le gazoduc GTA-Gandon"},{"@type":"WebSite","@id":"https:\/\/ornoir.africa\/#website","url":"https:\/\/ornoir.africa\/","name":"Or Noir Africa","description":"All about oil, gas, energy and mining in Africa","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/ornoir.africa\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/ornoir.africa\/#\/schema\/person\/c8f0dccd7692ef1c102cc8d1c2c5b5ea","name":"Mapath\u00e9 SOW","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/ornoir.africa\/wp-content\/litespeed\/avatar\/fc4f53fd7869a90ae23c8c991c62cc6f.jpg?ver=1794428260","url":"https:\/\/ornoir.africa\/wp-content\/litespeed\/avatar\/fc4f53fd7869a90ae23c8c991c62cc6f.jpg?ver=1794428260","contentUrl":"https:\/\/ornoir.africa\/wp-content\/litespeed\/avatar\/fc4f53fd7869a90ae23c8c991c62cc6f.jpg?ver=1794428260","caption":"Mapath\u00e9 SOW"},"url":"https:\/\/ornoir.africa\/en\/author\/admin\/"}]}},"_links":{"self":[{"href":"https:\/\/ornoir.africa\/en\/wp-json\/wp\/v2\/posts\/7288","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ornoir.africa\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ornoir.africa\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ornoir.africa\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ornoir.africa\/en\/wp-json\/wp\/v2\/comments?post=7288"}],"version-history":[{"count":1,"href":"https:\/\/ornoir.africa\/en\/wp-json\/wp\/v2\/posts\/7288\/revisions"}],"predecessor-version":[{"id":9442,"href":"https:\/\/ornoir.africa\/en\/wp-json\/wp\/v2\/posts\/7288\/revisions\/9442"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ornoir.africa\/en\/wp-json\/wp\/v2\/media\/7289"}],"wp:attachment":[{"href":"https:\/\/ornoir.africa\/en\/wp-json\/wp\/v2\/media?parent=7288"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ornoir.africa\/en\/wp-json\/wp\/v2\/categories?post=7288"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ornoir.africa\/en\/wp-json\/wp\/v2\/tags?post=7288"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}