{"id":5402,"date":"2024-02-15T02:50:40","date_gmt":"2024-02-15T02:50:40","guid":{"rendered":"https:\/\/ornoirafrica.com\/?p=5402"},"modified":"2024-02-15T02:50:40","modified_gmt":"2024-02-15T02:50:40","slug":"equatorial-guinea-trident-ends-island-innovator-platform-contract-off-country","status":"publish","type":"post","link":"https:\/\/ornoir.africa\/en\/equatorial-guinea-trident-ends-island-innovator-platform-contract-off-country\/","title":{"rendered":"Equatorial Guinea: Trident terminates contract for Island Innovator offshore platform."},"content":{"rendered":"<p><span>Le contrat pour la plate-forme semi-submersible Island Innovator d&rsquo;Island Drilling a \u00e9t\u00e9 r\u00e9sili\u00e9 par Trident Energy pour des raisons de s\u00e9curit\u00e9, mettant sur pause la campagne de forage sur\u00a0<\/span><span>\u00a0le bloc G,\u00a0<\/span><span>\u00a0au large de la Guin\u00e9e \u00e9quatoriale.<\/span><\/p>\n<p><span>La d\u00e9cision de r\u00e9silier le contrat actuel avec la plate-forme Island Innovator d&rsquo;Island Drilling a \u00e9t\u00e9 prise suite \u00e0 la recommandation de l&rsquo;op\u00e9rateur, Trident Energy (participation directe de 40,375 %), en accord avec les partenaires de la coentreprise sur le bloc G, dont Panoro (14,25 %). , Kosmos Energy (40,375%) et GEPetrol (5,0%).<\/span><\/p>\n<p><span>Selon Panoro, qui a fourni la mise \u00e0 jour, la coentreprise estime que la plate-forme n&rsquo;est pas op\u00e9rationnellement en \u00e9tat de forer les puits en toute s\u00e9curit\u00e9.\u00a0<\/span><\/p>\n<p><span>Au nom de ses partenaires, Trident Energy \u00e9value actuellement des options alternatives qui permettront de red\u00e9marrer et d&rsquo;achever en toute s\u00e9curit\u00e9 la campagne de forage pr\u00e9vue dans les plus brefs d\u00e9lais, potentiellement au cours du deuxi\u00e8me trimestre 2024, sous r\u00e9serve de la disponibilit\u00e9 des plates-formes et des conditions des options alternatives.<\/span><\/p>\n<p><span>Cela affecte \u00e9galement le puits d&rsquo;exploration Akeng Deep, exploit\u00e9 par Kosmos, dans le bloc S, qui devait \u00eatre for\u00e9 \u00e0 l&rsquo;aide d&rsquo;Island Innovator apr\u00e8s l&rsquo;ach\u00e8vement de la campagne de forage intercalaire de trois puits dans le bloc G qui a d\u00e9but\u00e9 en janvier.<\/span><\/p>\n<p><span>\u00ab La coentreprise ne fera aucun compromis sur la s\u00e9curit\u00e9, qui est d&rsquo;une importance primordiale, et a agi de mani\u00e8re d\u00e9cisive et responsable en prenant cette ligne de conduite.<\/span><\/p>\n<p><span>\u00ab Sur la base de nos estimations actuelles, la pause dans les forages ne devrait pas affecter les distributions aux actionnaires de Panoro, ainsi que ses objectifs financiers et op\u00e9rationnels pour l&rsquo;ann\u00e9e.<\/span><\/p>\n<p><span>\u00ab\u00a0Le report de la campagne de forage se traduit par un \u00e9chelonnement plus avantageux des d\u00e9penses d&rsquo;investissement \u00e0 l&rsquo;\u00e9chelle du groupe\u00a0\u00bb, a d\u00e9clar\u00e9 John Hamilton, PDG de Panoro.<\/span><\/p>","protected":false},"excerpt":{"rendered":"<p>Le contrat pour la plate-forme semi-submersible Island Innovator d&rsquo;Island Drilling a \u00e9t\u00e9 r\u00e9sili\u00e9 par Trident Energy pour des raisons de s\u00e9curit\u00e9, mettant sur pause la campagne de forage&hellip;<\/p>","protected":false},"author":1,"featured_media":5403,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"content-type":"","_lmt_disableupdate":"","_lmt_disable":"","page_builder":"","footnotes":""},"categories":[5,677],"tags":[314,3015],"class_list":["post-5402","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-actualite","category-gaz","tag-guinee-equatoriale","tag-trident"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Guin\u00e9e \u00c9quatoriale : Trident met fin au contrat de plate-forme Island Innovator au large du pays - Or Noir Africa<\/title>\n<meta name=\"description\" content=\"Le contrat pour la plate-forme semi-submersible Island Innovator d&#039;Island Drilling a \u00e9t\u00e9 r\u00e9sili\u00e9 par Trident Energy pour des raisons de s\u00e9curit\u00e9, mettant sur pause la campagne de forage sur\u00a0\u00a0le bloc G,\u00a0\u00a0au large de la Guin\u00e9e \u00e9quatoriale.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/ornoir.africa\/en\/equatorial-guinea-trident-ends-island-innovator-platform-contract-off-country\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Guin\u00e9e \u00c9quatoriale : Trident met fin au contrat de plate-forme Island Innovator au large du pays - Or Noir Africa\" \/>\n<meta property=\"og:description\" content=\"Le contrat pour la plate-forme semi-submersible Island Innovator d&#039;Island Drilling a \u00e9t\u00e9 r\u00e9sili\u00e9 par Trident Energy pour des raisons de s\u00e9curit\u00e9, mettant sur pause la campagne de forage sur\u00a0\u00a0le bloc G,\u00a0\u00a0au large de la Guin\u00e9e \u00e9quatoriale.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/ornoir.africa\/en\/equatorial-guinea-trident-ends-island-innovator-platform-contract-off-country\/\" \/>\n<meta property=\"og:site_name\" content=\"Or Noir Africa\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/OrNoirAfrica\" \/>\n<meta property=\"article:published_time\" content=\"2024-02-15T02:50:40+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/ornoir.africa\/wp-content\/uploads\/2024\/02\/Guinee-equatoriale-Trident-met-fin-au-contrat-de-plate-forme-Island-Innovator-au-large-du-pays.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Mapath\u00e9 SOW\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@OrNoirAfrica\" \/>\n<meta name=\"twitter:site\" content=\"@OrNoirAfrica\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Mapath\u00e9 SOW\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/ornoir.africa\\\/guinee-equatoriale-trident-met-fin-au-contrat-de-plate-forme-island-innovator-au-large-du-pays\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/ornoir.africa\\\/guinee-equatoriale-trident-met-fin-au-contrat-de-plate-forme-island-innovator-au-large-du-pays\\\/\"},\"author\":{\"name\":\"Mapath\u00e9 SOW\",\"@id\":\"https:\\\/\\\/ornoir.africa\\\/#\\\/schema\\\/person\\\/c8f0dccd7692ef1c102cc8d1c2c5b5ea\"},\"headline\":\"Guin\u00e9e \u00c9quatoriale : Trident met fin au contrat de plate-forme Island Innovator au large du pays\",\"datePublished\":\"2024-02-15T02:50:40+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/ornoir.africa\\\/guinee-equatoriale-trident-met-fin-au-contrat-de-plate-forme-island-innovator-au-large-du-pays\\\/\"},\"wordCount\":340,\"image\":{\"@id\":\"https:\\\/\\\/ornoir.africa\\\/guinee-equatoriale-trident-met-fin-au-contrat-de-plate-forme-island-innovator-au-large-du-pays\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/ornoir.africa\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Guinee-equatoriale-Trident-met-fin-au-contrat-de-plate-forme-Island-Innovator-au-large-du-pays.jpeg\",\"keywords\":[\"Guin\u00e9e \u00e9quatoriale\",\"Trident\"],\"articleSection\":[\"ACTUALIT\u00c9\",\"GAZ\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/ornoir.africa\\\/guinee-equatoriale-trident-met-fin-au-contrat-de-plate-forme-island-innovator-au-large-du-pays\\\/\",\"url\":\"https:\\\/\\\/ornoir.africa\\\/guinee-equatoriale-trident-met-fin-au-contrat-de-plate-forme-island-innovator-au-large-du-pays\\\/\",\"name\":\"Guin\u00e9e \u00c9quatoriale : Trident met fin au contrat de plate-forme Island Innovator au large du pays - Or Noir Africa\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/ornoir.africa\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/ornoir.africa\\\/guinee-equatoriale-trident-met-fin-au-contrat-de-plate-forme-island-innovator-au-large-du-pays\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/ornoir.africa\\\/guinee-equatoriale-trident-met-fin-au-contrat-de-plate-forme-island-innovator-au-large-du-pays\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/ornoir.africa\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Guinee-equatoriale-Trident-met-fin-au-contrat-de-plate-forme-Island-Innovator-au-large-du-pays.jpeg\",\"datePublished\":\"2024-02-15T02:50:40+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/ornoir.africa\\\/#\\\/schema\\\/person\\\/c8f0dccd7692ef1c102cc8d1c2c5b5ea\"},\"description\":\"Le contrat pour la plate-forme semi-submersible Island Innovator d'Island Drilling a \u00e9t\u00e9 r\u00e9sili\u00e9 par Trident Energy pour des raisons de s\u00e9curit\u00e9, mettant sur pause la campagne de forage sur\u00a0\u00a0le bloc G,\u00a0\u00a0au large de la Guin\u00e9e \u00e9quatoriale.\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/ornoir.africa\\\/guinee-equatoriale-trident-met-fin-au-contrat-de-plate-forme-island-innovator-au-large-du-pays\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/ornoir.africa\\\/guinee-equatoriale-trident-met-fin-au-contrat-de-plate-forme-island-innovator-au-large-du-pays\\\/#primaryimage\",\"url\":\"https:\\\/\\\/ornoir.africa\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Guinee-equatoriale-Trident-met-fin-au-contrat-de-plate-forme-Island-Innovator-au-large-du-pays.jpeg\",\"contentUrl\":\"https:\\\/\\\/ornoir.africa\\\/wp-content\\\/uploads\\\/2024\\\/02\\\/Guinee-equatoriale-Trident-met-fin-au-contrat-de-plate-forme-Island-Innovator-au-large-du-pays.jpeg\",\"width\":1200,\"height\":630,\"caption\":\"Guin\u00e9e \u00e9quatoriale : Trident met fin au contrat de plate-forme Island Innovator au large du pays\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/ornoir.africa\\\/#website\",\"url\":\"https:\\\/\\\/ornoir.africa\\\/\",\"name\":\"Or Noir Africa\",\"description\":\"Tous sur le P\u00e9trole, Gaz, \u00c9nergie &amp; Mines en Afrique\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/ornoir.africa\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/ornoir.africa\\\/#\\\/schema\\\/person\\\/c8f0dccd7692ef1c102cc8d1c2c5b5ea\",\"name\":\"Mapath\u00e9 SOW\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/ornoir.africa\\\/wp-content\\\/litespeed\\\/avatar\\\/fc4f53fd7869a90ae23c8c991c62cc6f.jpg?ver=1794428260\",\"url\":\"https:\\\/\\\/ornoir.africa\\\/wp-content\\\/litespeed\\\/avatar\\\/fc4f53fd7869a90ae23c8c991c62cc6f.jpg?ver=1794428260\",\"contentUrl\":\"https:\\\/\\\/ornoir.africa\\\/wp-content\\\/litespeed\\\/avatar\\\/fc4f53fd7869a90ae23c8c991c62cc6f.jpg?ver=1794428260\",\"caption\":\"Mapath\u00e9 SOW\"},\"url\":\"https:\\\/\\\/ornoir.africa\\\/en\\\/author\\\/admin\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Equatorial Guinea: Trident terminates contract for Island Innovator offshore platform - Or Noir Africa","description":"The contract for Island Drilling's Island Innovator semi-submersible platform has been terminated by Trident Energy for safety reasons, putting the drilling campaign on Block G, offshore Equatorial Guinea, on hold.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/ornoir.africa\/en\/equatorial-guinea-trident-ends-island-innovator-platform-contract-off-country\/","og_locale":"en_US","og_type":"article","og_title":"Guin\u00e9e \u00c9quatoriale : Trident met fin au contrat de plate-forme Island Innovator au large du pays - Or Noir Africa","og_description":"Le contrat pour la plate-forme semi-submersible Island Innovator d'Island Drilling a \u00e9t\u00e9 r\u00e9sili\u00e9 par Trident Energy pour des raisons de s\u00e9curit\u00e9, mettant sur pause la campagne de forage sur\u00a0\u00a0le bloc G,\u00a0\u00a0au large de la Guin\u00e9e \u00e9quatoriale.","og_url":"https:\/\/ornoir.africa\/en\/equatorial-guinea-trident-ends-island-innovator-platform-contract-off-country\/","og_site_name":"Or Noir Africa","article_publisher":"https:\/\/www.facebook.com\/OrNoirAfrica","article_published_time":"2024-02-15T02:50:40+00:00","og_image":[{"width":1200,"height":630,"url":"https:\/\/ornoir.africa\/wp-content\/uploads\/2024\/02\/Guinee-equatoriale-Trident-met-fin-au-contrat-de-plate-forme-Island-Innovator-au-large-du-pays.jpeg","type":"image\/jpeg"}],"author":"Mapath\u00e9 SOW","twitter_card":"summary_large_image","twitter_creator":"@OrNoirAfrica","twitter_site":"@OrNoirAfrica","twitter_misc":{"Written by":"Mapath\u00e9 SOW","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/ornoir.africa\/guinee-equatoriale-trident-met-fin-au-contrat-de-plate-forme-island-innovator-au-large-du-pays\/#article","isPartOf":{"@id":"https:\/\/ornoir.africa\/guinee-equatoriale-trident-met-fin-au-contrat-de-plate-forme-island-innovator-au-large-du-pays\/"},"author":{"name":"Mapath\u00e9 SOW","@id":"https:\/\/ornoir.africa\/#\/schema\/person\/c8f0dccd7692ef1c102cc8d1c2c5b5ea"},"headline":"Guin\u00e9e \u00c9quatoriale : Trident met fin au contrat de plate-forme Island Innovator au large du pays","datePublished":"2024-02-15T02:50:40+00:00","mainEntityOfPage":{"@id":"https:\/\/ornoir.africa\/guinee-equatoriale-trident-met-fin-au-contrat-de-plate-forme-island-innovator-au-large-du-pays\/"},"wordCount":340,"image":{"@id":"https:\/\/ornoir.africa\/guinee-equatoriale-trident-met-fin-au-contrat-de-plate-forme-island-innovator-au-large-du-pays\/#primaryimage"},"thumbnailUrl":"https:\/\/ornoir.africa\/wp-content\/uploads\/2024\/02\/Guinee-equatoriale-Trident-met-fin-au-contrat-de-plate-forme-Island-Innovator-au-large-du-pays.jpeg","keywords":["Guin\u00e9e \u00e9quatoriale","Trident"],"articleSection":["ACTUALIT\u00c9","GAZ"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/ornoir.africa\/guinee-equatoriale-trident-met-fin-au-contrat-de-plate-forme-island-innovator-au-large-du-pays\/","url":"https:\/\/ornoir.africa\/guinee-equatoriale-trident-met-fin-au-contrat-de-plate-forme-island-innovator-au-large-du-pays\/","name":"Equatorial Guinea: Trident terminates contract for Island Innovator offshore platform - Or Noir Africa","isPartOf":{"@id":"https:\/\/ornoir.africa\/#website"},"primaryImageOfPage":{"@id":"https:\/\/ornoir.africa\/guinee-equatoriale-trident-met-fin-au-contrat-de-plate-forme-island-innovator-au-large-du-pays\/#primaryimage"},"image":{"@id":"https:\/\/ornoir.africa\/guinee-equatoriale-trident-met-fin-au-contrat-de-plate-forme-island-innovator-au-large-du-pays\/#primaryimage"},"thumbnailUrl":"https:\/\/ornoir.africa\/wp-content\/uploads\/2024\/02\/Guinee-equatoriale-Trident-met-fin-au-contrat-de-plate-forme-Island-Innovator-au-large-du-pays.jpeg","datePublished":"2024-02-15T02:50:40+00:00","author":{"@id":"https:\/\/ornoir.africa\/#\/schema\/person\/c8f0dccd7692ef1c102cc8d1c2c5b5ea"},"description":"The contract for Island Drilling's Island Innovator semi-submersible platform has been terminated by Trident Energy for safety reasons, putting the drilling campaign on Block G, offshore Equatorial Guinea, on hold.","inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/ornoir.africa\/guinee-equatoriale-trident-met-fin-au-contrat-de-plate-forme-island-innovator-au-large-du-pays\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/ornoir.africa\/guinee-equatoriale-trident-met-fin-au-contrat-de-plate-forme-island-innovator-au-large-du-pays\/#primaryimage","url":"https:\/\/ornoir.africa\/wp-content\/uploads\/2024\/02\/Guinee-equatoriale-Trident-met-fin-au-contrat-de-plate-forme-Island-Innovator-au-large-du-pays.jpeg","contentUrl":"https:\/\/ornoir.africa\/wp-content\/uploads\/2024\/02\/Guinee-equatoriale-Trident-met-fin-au-contrat-de-plate-forme-Island-Innovator-au-large-du-pays.jpeg","width":1200,"height":630,"caption":"Guin\u00e9e \u00e9quatoriale : Trident met fin au contrat de plate-forme Island Innovator au large du pays"},{"@type":"WebSite","@id":"https:\/\/ornoir.africa\/#website","url":"https:\/\/ornoir.africa\/","name":"Or Noir Africa","description":"All about oil, gas, energy and mining in Africa","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/ornoir.africa\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/ornoir.africa\/#\/schema\/person\/c8f0dccd7692ef1c102cc8d1c2c5b5ea","name":"Mapath\u00e9 SOW","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/ornoir.africa\/wp-content\/litespeed\/avatar\/fc4f53fd7869a90ae23c8c991c62cc6f.jpg?ver=1794428260","url":"https:\/\/ornoir.africa\/wp-content\/litespeed\/avatar\/fc4f53fd7869a90ae23c8c991c62cc6f.jpg?ver=1794428260","contentUrl":"https:\/\/ornoir.africa\/wp-content\/litespeed\/avatar\/fc4f53fd7869a90ae23c8c991c62cc6f.jpg?ver=1794428260","caption":"Mapath\u00e9 SOW"},"url":"https:\/\/ornoir.africa\/en\/author\/admin\/"}]}},"_links":{"self":[{"href":"https:\/\/ornoir.africa\/en\/wp-json\/wp\/v2\/posts\/5402","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ornoir.africa\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ornoir.africa\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ornoir.africa\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ornoir.africa\/en\/wp-json\/wp\/v2\/comments?post=5402"}],"version-history":[{"count":0,"href":"https:\/\/ornoir.africa\/en\/wp-json\/wp\/v2\/posts\/5402\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ornoir.africa\/en\/wp-json\/wp\/v2\/media\/5403"}],"wp:attachment":[{"href":"https:\/\/ornoir.africa\/en\/wp-json\/wp\/v2\/media?parent=5402"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ornoir.africa\/en\/wp-json\/wp\/v2\/categories?post=5402"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ornoir.africa\/en\/wp-json\/wp\/v2\/tags?post=5402"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}