{"id":3089,"date":"2023-01-09T16:59:02","date_gmt":"2023-01-09T15:59:02","guid":{"rendered":"https:\/\/ornoirafrica.com\/?p=3089"},"modified":"2023-01-09T16:59:03","modified_gmt":"2023-01-09T15:59:03","slug":"nigeria-dolphin-drilling-remporte-de-nouveaux-contrats-pour-une-plate-forme-offshore-construite-en-1974","status":"publish","type":"post","link":"https:\/\/ornoir.africa\/en\/nigeria-dolphin-drilling-awards-new-contracts-for-offshore-platform-built-in-1974\/","title":{"rendered":"Nigeria : Dolphin Drilling remporte de nouveaux contrats pour une plate-forme offshore construite en 1974."},"content":{"rendered":"<p class=\"wp-block-paragraph\">La plate-forme de forage semi-submersible de Dolphin Drilling, le Blackford Dolphin, a re\u00e7u une lettre d&rsquo;attribution pour des travaux suppl\u00e9mentaires au Nigeria.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This additional work will be a direct continuation of the previously announced $96 million contract with General Hydrocarbon Limited (GHL).<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Dolphin a d\u00e9clar\u00e9 que le nouveau prix avait le potentiel de prolonger le carnet de commandes de la plate-forme d&rsquo;un minimum de 120 jours et jusqu&rsquo;\u00e0 485 jours, en plus du carnet de commandes GHL existant.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Including mobilization costs, the effective daily rate associated with the minimum firm period is $325,000<strong>.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u00ab\u00a0Suite \u00e0 un d\u00e9part retard\u00e9 du Mexique et \u00e0 une vitesse de transit r\u00e9duite, Blackford Dolphin est arriv\u00e9 \u00e0 Las Palmas, dans les \u00eeles Canaries, et a \u00e9t\u00e9 amarr\u00e9 en toute s\u00e9curit\u00e9 \u00e0 quai le 24 novembre 2022. Au chantier naval de Las Palmas, la plate-forme a fait l&rsquo;objet d&rsquo;une enqu\u00eate p\u00e9riodique sp\u00e9ciale (\u00a0\u00bb SPS \u00ab\u00a0), permettant un travail continu jusqu&rsquo;en 2028 \u00bb, a d\u00e9clar\u00e9 Dolphin Drilling.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Dolphin Drilling reported that the capital cost associated with the SPS was within the budget of $15 million.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La plate-forme de forage semi-submersible, construite en 1974, restera au chantier naval jusqu&rsquo;au d\u00e9but de f\u00e9vrier 2023. Selon la fiche technique de Blackford Dolphin, la plate-forme a subi d&rsquo;importantes am\u00e9liorations en 2008.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">After the Las Palmas SPS, the semi-submersible drilling rig will move to Port Hardcourt, Nigeria and begin work for GHL.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">La plate-forme a une profondeur d&rsquo;eau de fonctionnement maximale de 6 000 pieds (1 829 m\u00e8tres) et une profondeur de forage maximale de 30 000 pieds (9 144 m\u00e8tres)<\/p>","protected":false},"excerpt":{"rendered":"<p>La plate-forme de forage semi-submersible de Dolphin Drilling, le Blackford Dolphin, a re\u00e7u une lettre d&rsquo;attribution pour des travaux suppl\u00e9mentaires au Nigeria. Ces travaux suppl\u00e9mentaires entreront en vigueur&hellip;<\/p>","protected":false},"author":1,"featured_media":3090,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"content-type":"","_lmt_disableupdate":"","_lmt_disable":"","page_builder":"","footnotes":""},"categories":[5],"tags":[33,34,31,249,29,250,32],"class_list":["post-3089","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-actualite","tag-actualite","tag-africa","tag-afrique","tag-dolphin-drilling","tag-gaz","tag-nigeria","tag-petrole"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Nigeria : Dolphin Drilling remporte de nouveaux contrats pour une plate-forme offshore construite en 1974. - Or Noir Africa<\/title>\n<meta name=\"description\" content=\"La plate-forme de forage semi-submersible de Dolphin Drilling, le Blackford Dolphin, a re\u00e7u une lettre d&#039;attribution pour des travaux suppl\u00e9mentaires au Nigeria.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/ornoir.africa\/en\/nigeria-dolphin-drilling-awards-new-contracts-for-offshore-platform-built-in-1974\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Nigeria : Dolphin Drilling remporte de nouveaux contrats pour une plate-forme offshore construite en 1974. - Or Noir Africa\" \/>\n<meta property=\"og:description\" content=\"La plate-forme de forage semi-submersible de Dolphin Drilling, le Blackford Dolphin, a re\u00e7u une lettre d&#039;attribution pour des travaux suppl\u00e9mentaires au Nigeria.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/ornoir.africa\/en\/nigeria-dolphin-drilling-awards-new-contracts-for-offshore-platform-built-in-1974\/\" \/>\n<meta property=\"og:site_name\" content=\"Or Noir Africa\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/OrNoirAfrica\" \/>\n<meta property=\"article:published_time\" content=\"2023-01-09T15:59:02+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-01-09T15:59:03+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/ornoir.africa\/wp-content\/uploads\/2023\/01\/Nigeria-Dolphin-Drilling-remporte-de-nouveaux-contrats-pour-une-plate-forme-offshore-construite-en-1974..jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"1904\" \/>\n\t<meta property=\"og:image:height\" content=\"1536\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Mapath\u00e9 SOW\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@OrNoirAfrica\" \/>\n<meta name=\"twitter:site\" content=\"@OrNoirAfrica\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Mapath\u00e9 SOW\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/ornoir.africa\\\/nigeria-dolphin-drilling-remporte-de-nouveaux-contrats-pour-une-plate-forme-offshore-construite-en-1974\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/ornoir.africa\\\/nigeria-dolphin-drilling-remporte-de-nouveaux-contrats-pour-une-plate-forme-offshore-construite-en-1974\\\/\"},\"author\":{\"name\":\"Mapath\u00e9 SOW\",\"@id\":\"https:\\\/\\\/ornoir.africa\\\/#\\\/schema\\\/person\\\/c8f0dccd7692ef1c102cc8d1c2c5b5ea\"},\"headline\":\"Nigeria : Dolphin Drilling remporte de nouveaux contrats pour une plate-forme offshore construite en 1974.\",\"datePublished\":\"2023-01-09T15:59:02+00:00\",\"dateModified\":\"2023-01-09T15:59:03+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/ornoir.africa\\\/nigeria-dolphin-drilling-remporte-de-nouveaux-contrats-pour-une-plate-forme-offshore-construite-en-1974\\\/\"},\"wordCount\":291,\"image\":{\"@id\":\"https:\\\/\\\/ornoir.africa\\\/nigeria-dolphin-drilling-remporte-de-nouveaux-contrats-pour-une-plate-forme-offshore-construite-en-1974\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/ornoir.africa\\\/wp-content\\\/uploads\\\/2023\\\/01\\\/Nigeria-Dolphin-Drilling-remporte-de-nouveaux-contrats-pour-une-plate-forme-offshore-construite-en-1974..jpeg\",\"keywords\":[\"Actualit\u00e9\",\"Africa\",\"Afrique\",\"Dolphin Drilling\",\"Gaz\",\"Nig\u00e9ria\",\"P\u00e9trole\"],\"articleSection\":[\"ACTUALIT\u00c9\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/ornoir.africa\\\/nigeria-dolphin-drilling-remporte-de-nouveaux-contrats-pour-une-plate-forme-offshore-construite-en-1974\\\/\",\"url\":\"https:\\\/\\\/ornoir.africa\\\/nigeria-dolphin-drilling-remporte-de-nouveaux-contrats-pour-une-plate-forme-offshore-construite-en-1974\\\/\",\"name\":\"Nigeria : Dolphin Drilling remporte de nouveaux contrats pour une plate-forme offshore construite en 1974. - Or Noir Africa\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/ornoir.africa\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/ornoir.africa\\\/nigeria-dolphin-drilling-remporte-de-nouveaux-contrats-pour-une-plate-forme-offshore-construite-en-1974\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/ornoir.africa\\\/nigeria-dolphin-drilling-remporte-de-nouveaux-contrats-pour-une-plate-forme-offshore-construite-en-1974\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/ornoir.africa\\\/wp-content\\\/uploads\\\/2023\\\/01\\\/Nigeria-Dolphin-Drilling-remporte-de-nouveaux-contrats-pour-une-plate-forme-offshore-construite-en-1974..jpeg\",\"datePublished\":\"2023-01-09T15:59:02+00:00\",\"dateModified\":\"2023-01-09T15:59:03+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/ornoir.africa\\\/#\\\/schema\\\/person\\\/c8f0dccd7692ef1c102cc8d1c2c5b5ea\"},\"description\":\"La plate-forme de forage semi-submersible de Dolphin Drilling, le Blackford Dolphin, a re\u00e7u une lettre d'attribution pour des travaux suppl\u00e9mentaires au Nigeria.\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/ornoir.africa\\\/nigeria-dolphin-drilling-remporte-de-nouveaux-contrats-pour-une-plate-forme-offshore-construite-en-1974\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/ornoir.africa\\\/nigeria-dolphin-drilling-remporte-de-nouveaux-contrats-pour-une-plate-forme-offshore-construite-en-1974\\\/#primaryimage\",\"url\":\"https:\\\/\\\/ornoir.africa\\\/wp-content\\\/uploads\\\/2023\\\/01\\\/Nigeria-Dolphin-Drilling-remporte-de-nouveaux-contrats-pour-une-plate-forme-offshore-construite-en-1974..jpeg\",\"contentUrl\":\"https:\\\/\\\/ornoir.africa\\\/wp-content\\\/uploads\\\/2023\\\/01\\\/Nigeria-Dolphin-Drilling-remporte-de-nouveaux-contrats-pour-une-plate-forme-offshore-construite-en-1974..jpeg\",\"width\":1904,\"height\":1536,\"caption\":\"Nigeria : Dolphin Drilling remporte de nouveaux contrats pour une plate-forme offshore construite en 1974.\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/ornoir.africa\\\/#website\",\"url\":\"https:\\\/\\\/ornoir.africa\\\/\",\"name\":\"Or Noir Africa\",\"description\":\"Tous sur le P\u00e9trole, Gaz, \u00c9nergie &amp; Mines en Afrique\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/ornoir.africa\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/ornoir.africa\\\/#\\\/schema\\\/person\\\/c8f0dccd7692ef1c102cc8d1c2c5b5ea\",\"name\":\"Mapath\u00e9 SOW\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/ornoir.africa\\\/wp-content\\\/litespeed\\\/avatar\\\/fc4f53fd7869a90ae23c8c991c62cc6f.jpg?ver=1794428260\",\"url\":\"https:\\\/\\\/ornoir.africa\\\/wp-content\\\/litespeed\\\/avatar\\\/fc4f53fd7869a90ae23c8c991c62cc6f.jpg?ver=1794428260\",\"contentUrl\":\"https:\\\/\\\/ornoir.africa\\\/wp-content\\\/litespeed\\\/avatar\\\/fc4f53fd7869a90ae23c8c991c62cc6f.jpg?ver=1794428260\",\"caption\":\"Mapath\u00e9 SOW\"},\"url\":\"https:\\\/\\\/ornoir.africa\\\/en\\\/author\\\/admin\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Nigeria : Dolphin Drilling remporte de nouveaux contrats pour une plate-forme offshore construite en 1974. - Or Noir Africa","description":"La plate-forme de forage semi-submersible de Dolphin Drilling, le Blackford Dolphin, a re\u00e7u une lettre d'attribution pour des travaux suppl\u00e9mentaires au Nigeria.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/ornoir.africa\/en\/nigeria-dolphin-drilling-awards-new-contracts-for-offshore-platform-built-in-1974\/","og_locale":"en_US","og_type":"article","og_title":"Nigeria : Dolphin Drilling remporte de nouveaux contrats pour une plate-forme offshore construite en 1974. - Or Noir Africa","og_description":"La plate-forme de forage semi-submersible de Dolphin Drilling, le Blackford Dolphin, a re\u00e7u une lettre d'attribution pour des travaux suppl\u00e9mentaires au Nigeria.","og_url":"https:\/\/ornoir.africa\/en\/nigeria-dolphin-drilling-awards-new-contracts-for-offshore-platform-built-in-1974\/","og_site_name":"Or Noir Africa","article_publisher":"https:\/\/www.facebook.com\/OrNoirAfrica","article_published_time":"2023-01-09T15:59:02+00:00","article_modified_time":"2023-01-09T15:59:03+00:00","og_image":[{"width":1904,"height":1536,"url":"https:\/\/ornoir.africa\/wp-content\/uploads\/2023\/01\/Nigeria-Dolphin-Drilling-remporte-de-nouveaux-contrats-pour-une-plate-forme-offshore-construite-en-1974..jpeg","type":"image\/jpeg"}],"author":"Mapath\u00e9 SOW","twitter_card":"summary_large_image","twitter_creator":"@OrNoirAfrica","twitter_site":"@OrNoirAfrica","twitter_misc":{"Written by":"Mapath\u00e9 SOW","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/ornoir.africa\/nigeria-dolphin-drilling-remporte-de-nouveaux-contrats-pour-une-plate-forme-offshore-construite-en-1974\/#article","isPartOf":{"@id":"https:\/\/ornoir.africa\/nigeria-dolphin-drilling-remporte-de-nouveaux-contrats-pour-une-plate-forme-offshore-construite-en-1974\/"},"author":{"name":"Mapath\u00e9 SOW","@id":"https:\/\/ornoir.africa\/#\/schema\/person\/c8f0dccd7692ef1c102cc8d1c2c5b5ea"},"headline":"Nigeria : Dolphin Drilling remporte de nouveaux contrats pour une plate-forme offshore construite en 1974.","datePublished":"2023-01-09T15:59:02+00:00","dateModified":"2023-01-09T15:59:03+00:00","mainEntityOfPage":{"@id":"https:\/\/ornoir.africa\/nigeria-dolphin-drilling-remporte-de-nouveaux-contrats-pour-une-plate-forme-offshore-construite-en-1974\/"},"wordCount":291,"image":{"@id":"https:\/\/ornoir.africa\/nigeria-dolphin-drilling-remporte-de-nouveaux-contrats-pour-une-plate-forme-offshore-construite-en-1974\/#primaryimage"},"thumbnailUrl":"https:\/\/ornoir.africa\/wp-content\/uploads\/2023\/01\/Nigeria-Dolphin-Drilling-remporte-de-nouveaux-contrats-pour-une-plate-forme-offshore-construite-en-1974..jpeg","keywords":["Actualit\u00e9","Africa","Afrique","Dolphin Drilling","Gaz","Nig\u00e9ria","P\u00e9trole"],"articleSection":["ACTUALIT\u00c9"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/ornoir.africa\/nigeria-dolphin-drilling-remporte-de-nouveaux-contrats-pour-une-plate-forme-offshore-construite-en-1974\/","url":"https:\/\/ornoir.africa\/nigeria-dolphin-drilling-remporte-de-nouveaux-contrats-pour-une-plate-forme-offshore-construite-en-1974\/","name":"Nigeria : Dolphin Drilling remporte de nouveaux contrats pour une plate-forme offshore construite en 1974. - Or Noir Africa","isPartOf":{"@id":"https:\/\/ornoir.africa\/#website"},"primaryImageOfPage":{"@id":"https:\/\/ornoir.africa\/nigeria-dolphin-drilling-remporte-de-nouveaux-contrats-pour-une-plate-forme-offshore-construite-en-1974\/#primaryimage"},"image":{"@id":"https:\/\/ornoir.africa\/nigeria-dolphin-drilling-remporte-de-nouveaux-contrats-pour-une-plate-forme-offshore-construite-en-1974\/#primaryimage"},"thumbnailUrl":"https:\/\/ornoir.africa\/wp-content\/uploads\/2023\/01\/Nigeria-Dolphin-Drilling-remporte-de-nouveaux-contrats-pour-une-plate-forme-offshore-construite-en-1974..jpeg","datePublished":"2023-01-09T15:59:02+00:00","dateModified":"2023-01-09T15:59:03+00:00","author":{"@id":"https:\/\/ornoir.africa\/#\/schema\/person\/c8f0dccd7692ef1c102cc8d1c2c5b5ea"},"description":"La plate-forme de forage semi-submersible de Dolphin Drilling, le Blackford Dolphin, a re\u00e7u une lettre d'attribution pour des travaux suppl\u00e9mentaires au Nigeria.","inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/ornoir.africa\/nigeria-dolphin-drilling-remporte-de-nouveaux-contrats-pour-une-plate-forme-offshore-construite-en-1974\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/ornoir.africa\/nigeria-dolphin-drilling-remporte-de-nouveaux-contrats-pour-une-plate-forme-offshore-construite-en-1974\/#primaryimage","url":"https:\/\/ornoir.africa\/wp-content\/uploads\/2023\/01\/Nigeria-Dolphin-Drilling-remporte-de-nouveaux-contrats-pour-une-plate-forme-offshore-construite-en-1974..jpeg","contentUrl":"https:\/\/ornoir.africa\/wp-content\/uploads\/2023\/01\/Nigeria-Dolphin-Drilling-remporte-de-nouveaux-contrats-pour-une-plate-forme-offshore-construite-en-1974..jpeg","width":1904,"height":1536,"caption":"Nigeria : Dolphin Drilling remporte de nouveaux contrats pour une plate-forme offshore construite en 1974."},{"@type":"WebSite","@id":"https:\/\/ornoir.africa\/#website","url":"https:\/\/ornoir.africa\/","name":"Or Noir Africa","description":"Tous sur le P\u00e9trole, Gaz, \u00c9nergie &amp; Mines en Afrique","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/ornoir.africa\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/ornoir.africa\/#\/schema\/person\/c8f0dccd7692ef1c102cc8d1c2c5b5ea","name":"Mapath\u00e9 SOW","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/ornoir.africa\/wp-content\/litespeed\/avatar\/fc4f53fd7869a90ae23c8c991c62cc6f.jpg?ver=1794428260","url":"https:\/\/ornoir.africa\/wp-content\/litespeed\/avatar\/fc4f53fd7869a90ae23c8c991c62cc6f.jpg?ver=1794428260","contentUrl":"https:\/\/ornoir.africa\/wp-content\/litespeed\/avatar\/fc4f53fd7869a90ae23c8c991c62cc6f.jpg?ver=1794428260","caption":"Mapath\u00e9 SOW"},"url":"https:\/\/ornoir.africa\/en\/author\/admin\/"}]}},"_links":{"self":[{"href":"https:\/\/ornoir.africa\/en\/wp-json\/wp\/v2\/posts\/3089","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ornoir.africa\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ornoir.africa\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ornoir.africa\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ornoir.africa\/en\/wp-json\/wp\/v2\/comments?post=3089"}],"version-history":[{"count":0,"href":"https:\/\/ornoir.africa\/en\/wp-json\/wp\/v2\/posts\/3089\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ornoir.africa\/en\/wp-json\/wp\/v2\/media\/3090"}],"wp:attachment":[{"href":"https:\/\/ornoir.africa\/en\/wp-json\/wp\/v2\/media?parent=3089"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ornoir.africa\/en\/wp-json\/wp\/v2\/categories?post=3089"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ornoir.africa\/en\/wp-json\/wp\/v2\/tags?post=3089"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}